Issue | Notes | Resolution | Person |
---|
Interface Form for Clint’s items | - automation to complete all tasks on ORC Request Form submissions and assignee Talyn
- Verify editable and non editable fields
- Reformat form
| Add ORC Request field to Projects (Link through to deliverables and tasks) Add to form with default check (non-editable) Remove assessment needed field
| |
Priority Items not showing on Tech Interface | | Remove BR-UNI and CP-RAR filters | |
Too many tech interfaces | Figure out what is needed and what we can elimate | | Branson |
Verify with LaLine - Actual Due Date vs. Preferred Due Date - eliminate preferred due dates? | | | |
- When “No Digitization Needed” is selected, add “Previously Digitized” to Primary Equipment
| Previous Meeting | | Margaret |
- Update manual scan totals per equipment on Snapshot
| Previous Meeting | | Margaret |
- Eliminate Final QC requirement
| Previous Meeting | | Margaret |
- Ensure curators are looking for Box link for completed projects, rather than a message from Branson
| Previous Meeting | | Branson |
- Move Delivery tasks to Tech Interface for QC person to check off. If the Box link is missing, have them write a note tagging Branson
| Previous Meeting - Are we good with this workflow change? Is this the same as item below | | Margaret |
- Change Tech Interface to Digitization Interface and add a QC Interface with access to delivery
| Previous Meeting Change name to Digitization Interface? Separate delivery interface or combined with QC (see above)? Copy Final QC and Delivery interface to new QC Interface and add all QC tasks (including student QC AND final QC and delivery) Branson will meet with tech team to discuss the new QC interface
| | |
- “No Digitization Needed” projects remain in delivery queue
| Previous Meeting - What does this mean? | | |
- Is there a way to use two lines on a line graph (i.e. high speed scanners vs roboscan vs flatbed vs camera)
| https://community.airtable.com/t5/interface-designer/how-to-build-multi-series-line-charts/td-p/159245 What do we want to track with the 2 lines? | | Margaret |
Check why these don’t have primary equipment: DD-PHS-2110-1017 DD-PHB-2191-1208 LR-OTH-2282-0131 | | | Branson |
Fix deliverables completed in all tables | This affects: | | |