Issue | Notes | Resolution | Person |
---|
Interface Form for Clint’s items | | | |
Priority Items not showing on Tech Interface | | | |
Verify with LaLine - Actual Due Date vs. Preferred Due Date - eliminate preferred due dates? | | | |
- When “No Digitization Needed” is selected, add “Previously Digitized” to Primary Equipment
| Previous Meeting | | Margaret |
- Update manual scan totals per equipment on Snapshot
| Previous Meeting | | Margaret |
- Eliminate Final QC requirement
| Previous Meeting | | Margaret |
- Ensure curators are looking for Box link for completed projects, rather than a message from Branson
| Previous Meeting | | Branson |
- Move Delivery tasks to Tech Interface for QC person to check off. If the Box link is missing, have them write a note tagging Branson
| Previous Meeting - Are we good with this workflow change? Is this the same as item below | | Margaret |
- Change Tech Interface to Digitization Interface and add a QC Interface with access to delivery
| Previous Meeting | | |
- “No Digitization Needed” projects remain in delivery queue
| Previous Meeting - What does this mean? | | |
- Is there a way to use two lines on a line graph (i.e. high speed scanners vs roboscan vs flatbed vs camera)
| https://community.airtable.com/t5/interface-designer/how-to-build-multi-series-line-charts/td-p/159245 What do we want to track with the 2 lines? | | Margaret |
Check why these don’t have primary equipment: DD-PHS-2110-1017 DD-PHB-2191-1208 LR-OTH-2282-0131 | | | Branson |
| | | |